The Cluster You Have Been Renting, as an Asset on Your Balance Sheet.
Training runs that are no longer experiments deserve infrastructure that is no longer rented. We size the fabric, storage and cooling to your checkpoint cadence and deliver first tokens in weeks, not quarters.
4,000
GPUs delivered in 13 weeks
800 G
rail-optimised fabric
1.6T
ready optics and trunks
What Buyers Ask Us First
- How fast can we be training on hardware we own?
- Will the fabric keep up with our all-reduce at scale?
- What is the refresh path to Vera Rubin without rebuilding the hall?
- Can procurement get allocation at partner pricing?
Frameworks We Design To
Mapped at the design stage so the evidence exists at handover.
NVIDIA reference architectures (DGX SuperPOD, Spectrum-X)Rail-optimised topology designASHRAE W32/W45 liquid classesMLPerf-style burn-in and acceptance
Services That Apply
Proof
4,000-GPU training cluster in 90 days
8 MW of liquid-cooled capacity delivered with a modular build and pre-procured power; first tokens in 13 weeks.
Scope a Training Cluster
Tell us the workload, the site and the timeline. A senior engineer replies within one business day.
