Make the Next Tenant's 140 kW Racks Fit the Hall You Already Built.
Air-cooled halls at 8–15 kW per rack are losing deals to liquid. We design and install the CDUs, manifolds, busway and structural upgrades that turn existing white space into leasable GPU capacity — row by row, while the hall stays live.
140 kW
per rack after retrofit
8–10 wks
row retrofit, assessment to live
Live
hall stays in production
What Buyers Ask Us First
- Can we retrofit without taking the hall down?
- What density can the slab and the plant actually support?
- Can you deliver a tenant fit-out on the tenant's timeline?
- Who owns the liquid loop interface and the leak risk?
Frameworks We Design To
Mapped at the design stage so the evidence exists at handover.
ASHRAE TC 9.9 liquid-cooling guidelinesUptime Tier III maintainabilityTenant SLA and acceptance criteriaBMS and DCIM integration to breaker and manifold level
Services That Apply
Proof
Tenant-ready liquid rows
Retrofit rows engineered into live halls with phased tie-ins and automatic leak isolation at every manifold.
Assess a Hall for Liquid
Tell us the workload, the site and the timeline. A senior engineer replies within one business day.
