Engineering Bandwidth for the Hall You Have to Open Next Quarter.
Your team is sold out on the current region. We take the next one from powered shell to commissioned racks — design, procurement, installation, L1–L5 — as an extension of your engineering organisation, on your standards.
60 MW
campus delivered build-to-suit
L1–L5
commissioning under one team
Texas
power-rich, fast-permit sites
What Buyers Ask Us First
- Can you build to our reference design and our BOM?
- Will you take the whole hall or just the mechanical scope?
- How do you handle allocation and lead-time risk on our behalf?
- Can you run the hall while we hire the local team?
Frameworks We Design To
Mapped at the design stage so the evidence exists at handover.
Customer reference architectures and BOMsUptime Tier III concurrently maintainable designOCP rack and power-shelf standardsSite acceptance and L5 integrated systems testing
Services That Apply
Proof
Powered land to 60 MW campus
Site selection, 60 MW utility interconnect and phased build-to-suit delivery for a cloud provider expanding GPU regions in Texas.
Talk About Your Next Hall
Tell us the workload, the site and the timeline. A senior engineer replies within one business day.
