Trust & Compliance

Built For The People Who Review The Contract

Security, compliance and accountability are design inputs, not a slide at the end. Here is what we design to and what we hand over.

Tier III
Concurrently maintainable designs
PUE 1.1
Design target, warm-water liquid
SOC 2 · ISO 27001
Control-ready facility designs
HIPAA · FedRAMP path
Regulated and sovereign workloads
NFPA 70 · ASHRAE
Code-stamped electrical and mechanical

Export-Control And KYC Discipline

Every GPU order passes end-use and end-user screening before capacity is committed. We keep the paper trail your counsel will ask for.

Residency Fixed In The Design

Your data lives in your building or your cage, on hardware only you use. Sovereignty at the rack level, written into the design basis.

One Accountable Owner

A named program lead and escalation path from discovery through handover — and into operations if you keep us on.

How We Work

Design-Stage Control Mapping

SOC 2, ISO 27001, HIPAA and NIST 800-53 physical and environmental controls are mapped into the design basis, so the evidence exists in the drawings and commissioning records rather than being reconstructed later.

Supply-Chain Custody

Every GPU, switch and CDU is procured through authorised distribution with serial-level tracking from distributor to rack. Export-control and end-user screening is completed before capacity is committed.

Physical Security By Default

Manned posts, biometric access, mantraps and per-cage CCTV are standard in our reference designs; air-gapped halls add isolated pathways and controlled media handling.

Commissioning Evidence

L1–L5 commissioning produces signed test records, thermal maps and integrated-systems results. As-builts, BOM with serials and runbooks are delivered at handover.

Operational Accountability

A named program lead through delivery and a named NOC owner in operations. Escalation paths and SLA reporting are defined in the contract, not discovered in an incident.

Insurance And Agreements

General and professional liability cover appropriate to critical-facility work; mutual NDA and master services agreement available on request before any site information is exchanged.

Need A Security Questionnaire Answered?

Send your questionnaire or control list and we will return a completed response with supporting design narratives.

Request Compliance Pack

Ready to scope your build?

Talk to our engineering team. Every inquiry gets a same-day response and a dedicated solutions engineer.

Start a conversation